Hi guest ,  welcome to JOBSCDC.com  |  
Advertisements

PT Pertamina Geothermal Energy - Engineer, Senior Engineer PGE Pertamina Group April 2015

Written By JobsCDC on 20.4.15 | 7:21 PM

Advertisements


Pertamina Geothermal Energy
Pertamina Geothermal Energy / pge.pertamina.com
PT Pertamina Geothermal Energy - PGE or later known as Pertamina GE is a company specialize in utilizing geothermal energy, including exploration for and production of steam and generation of electricity. PT Pertamina Geothermal Energy is a subsidiaries upstream business unit of PT Pertamina (Persero), a reputable state-owned oil company of Indonesia. PT Pertamina (Persero) owns a 90 percent stake in Pertamina GE with the remainder of the shares belonging to PT Pertamina Dana Ventura (PDV). Pertamina GE is based in Jakarta and now has 15 geothermal working areas (GWA), including 9 working areas are operated by Pertamina GE, 5 Joint Operation Contracts (KOB) and 1 Joint Venture (JV). Pertamina GE had showed significant operational results in 2012. According to Petamina GE Annual Report 2012 as quoted by JobsCDC.com, Pertamina GE posted total renevues of US$543.58 million and profit of US$95.08 million in 2012.

To achieve the company vision, to become world-class geothermal energy enterprise, PT Pertamina Geothermal Energy invites qualified candidates to fullfill the position as follows

Engineer QA/QC ( PGE/PDV/04 )

Requirements
  • Education:
    • Minimum requirement of Undergraduate Degree (S1) in Engineering.
  • Experience
    • Minimum 10 years of experience in the field of engineering, including the last 7 years of experience as a QA / QC Engineer at EPCC Mechamcal / Electrical Projects.
    • Experienced in project monitoring of the quality and working procedures.
  • Location Placement:
    • Lumut Balai project of Sumatera.
    • Karaha Project of West Java.
Senior Engineer Construction ( PGE/PDV/03 )

Requirements
  • Education:
    • Minimum requirement of Undergraduate Degree (S1) in Engineering.
  • Experience
    • Minimum 10 years of experience in the field of engineering Process / Mechanical / Civil / Electrical at EPCC Project Energy / Petrochemical / Gas.
  • Location Placement:
    • Lumut Balai project of Sumatera.
    • Karaha Project of West Java.
For further information, please refer official source from PT Pertamina (Persero) on following link below. If you feel you are the one who have those requirement above, feel free to apply directly by submitting your application to PGE/PDV/03 - PGE/PDV/04. Closing date 30 April 2015. All applications will be treated in strict confidential and only use for the purpose of selection. (JobsCDC.com / Source)

Notes :
JobsCDC.com now available on android device. Download now on Google Play here. Please be aware of recruitment fraud. The entire stage of this selection process is free of charge. PT Pertamina Geothermal Energy - Engineer, Senior Engineer PGE Pertamina Group April 2015 will never ask for fees or upfront payments for any purposes during the recruitment process such as transportation and accommodation.
Advertisements

Related Jobs :


Share this article on :
 
Business Blogs My Zimbio Business Top Blogs