Advertisements
Adaro Energy / adaro.com |
PT Adaro Energy Tbk - Adaro Group is one of the Indonesian largest thermal coal producer. In 2011, Adaro Group produced 47.7 million tonnes as its Production/Sales, increased from 42.2 million tonnes in 2010. The Company operated since 2004 and formerly known as PT Padang Kurnia. In 2008, its name changed into current and became the public company after listed on Indonesia Stock Exchange (IDX). Adaro's plants located in South Kalomantan (Tabalong and Balangan districts) and currently supported by 7 subsidiary companies, namely PT Adaro Indonesia, PT Saptaindra Sejati, PT Makmur Sejahtera Wisesa, PT Maritim Barito Perkasa, PT Sarana Daya Mandiri, PT Indonesia Bulk Terminal, PT Coaltrade Services Intl.
In line with its vision, to be the largest and most efficient integrated coal mining and energy company in Southeast Asia, currently PT Adaro Energy Tbk invites the best professional peoples to join as following position :
OPCC Engineer Preparation Program
Requirements
Official Source
OPCC Engineer Preparation Program
Requirements
- Candidate must possess at least a Bachelor's Degree, Engineering (Electrical - Instrumental) or Engineering (Mechanical) or equivalent with minimum GPA 2.80
- Fresh graduate or having maximum 3 years experience
- Preferably Staff specializing in Engineering - Electrical or equivalent.
- Willing to be located in Tanjung - Tabalong, Kalimantan Selatan
Advertisements